LAND DEVELOPMENT FOR LSP COMPLEX PROJECT

08/03/2019

The package items includes remove and reuse soil inside the project and filling using sand  and crush stone as well. The categories were made by Bang Duong under Bidding LSP Package L – Earthwork with the total value around VND 180 billion. Execution time was expected from December 2018 to the end of September 2019. POSCO E&C is the main constructor of LSP Package L- Land Development.

Long Son Petrochemicals Refinery Company Ltd (a joint venture of Thai SCG and PetroVietnam) with a total investment capital of US$ 5.4 billion was started construction since Feb, 2018. This is the first oil refinery complex with designed capacity 1,6 Mil ton/year. Its products will replace polyolefin products which are mainly imported to Vietnam. The project also includes other infrastructures together with the oil refinery complex and deep water port.

LS 2

Image of Moving soil on site

LS 1

 

LS 5

LS 6

With soil moving volume around 1.5 million cubic meters, the constructor must work on three shifts

 

 

 

Construction projects Related